The study described in this article, was carried out on different types of cables with different conductor sizes and bundle sizes. At the end of the article, some interesting observations and findings are included. One test for PoE takes approximately 16 hours of time, which is huge in the day in and day out work for the development and quality engineers to spare for each cable. So during this study, a simulation model was generated, which predicts the temperature rise for different types of cables, bundle size and conductor size for the given environmental conditions. This article also gives some insight on the validation of the model versus actual measured temperature for the given test configuration.
Read More